master production schedule

[ˈmɑːstə(r) prəˈdʌkʃn ˈʃedjuːl]
  • 释义

    主生产计划;

数据更新时间:2025-12-29 22:50:45
1、

Simulation Study on Instability of Master Production Schedule

主生产计划不稳定性的模拟研究

互联网摘选

2、

Master Production Schedule Planning Information System-MPS PIS

厂级生产作业计划信息系统&MPSPIS

互联网摘选

3、

Research of master production schedule in the manufacturing ERP system

制造业ERP主生产计划模块研究

互联网摘选

4、

Under capacitated rolling-horizon scheduling, a simulation is conducted to study the impact of the freezing parameters and the scheduling algorithms on the instability of the master production schedule in different production environments.

在能力受限的滚动式计划环境下,研究冻结参数和计划算法在不同生产条件下对主生产计划不稳定性的影响。

互联网摘选

5、

Forecasting Master Production Schedule ( MPS) correctly is an important but difficult issue of Enterprise Resource Planning.

准确地进行主生产计划预测是企业资源计划管理的重点和难度问题。

互联网摘选

6、

This paper introduces a master production schedule planning information system on a factory level. It is made on the basis of the MRP theory and can be realized on a microcomputer by using dBASE ⅲ. Its logic model and control structure are also given in the paper.

本文介绍了一个根据MRP思想利用dBASEⅡ在微型机上实现的厂级生产作业计划信息系统,并给出了系统的逻辑模型和控制结构。

互联网摘选

7、

Master Production Schedule ( MPS) is the core of ERP. MPS focuses on production plan and schedule, plan drive and storage control so that it can guarantee the fluency and optimization of the production.

其主生产计划(Master Production Schedule,MPS)模块是ERP的核心部分,主要涉及生产计划的制定和排产,整个生产计划的驱动和库存量的控制,从而保证生产的流畅和优化。

互联网摘选

8、

Divide the period according to the feature of MTS/ MTO enterprises, and the set up the 0-1 mixed integer programming production master production schedule model, which is sloved by hybrid encoding Genetic Algorithm.

根据MTS/MTO混合型企业生产模式的特点进行了时段划分,并以此建立了0-1混合整数规划的主生产计划优化决策模型,采用混合编码的遗传算法进行了求解。

互联网摘选

9、

With this model, MRP ⅱ was oriented to enterprise level taking charge of Master Production Schedule ( MPS), Material Requirement Planning ( MRP), and monthly/ weekly component parts planning on various workshops.

在此模型中,制造资源计划定位在厂级或企业级,负责主生产计划、物料需求计划及各车间零部件的月、周计划;

互联网摘选

10、

ARMA-BP model for optimizing master production schedule in process enterprises

流程型企业主生产计划优化的ARMA-BP模型

互联网摘选

11、

The file uses WBS ( Work Breakdown Structure) which comes from Industry Engineering ( IE) for reference, then it presents a project about MPS ( Master Production Schedule) management which is based on WBS.

借鉴工业工程(IE)中的WBS(工作分解结构)管理思想,提出了基于WBS的主生产计划管理设计方案;

互联网摘选

  • 相关词组
  • 今日热词
  • 热门搜索
  • away[əˈweɪ] adv.离开,远离;在远处;消失;adj.不在的;遥远的;客场比赛;
  • brother[ˈbrʌðə(r)] n. 兄弟;同事,同胞;同志;int. (表示生气或吃惊)我的老兄!;
  • CCTV[ˌsi: si: ti: ˈvi:] n.中央电视台;中国中央电视台(China Central Television);闭路电视(Closed Circuit Television);
  • venti[ˈvɛnti] 超大杯;法国梵迪珠宝;
  • must[mʌst , məst] modal. 必须;一定;应该;一定要;n.必须做的事;
  • fail[feɪl] v.失败;没有做;出故障;倒闭;衰弱;不够;不及格;评定不及格n.考试不及格;
  • csc 肿瘤干细胞;国家留学基金委;余割;余割(cosecant)的符号;中心性浆液性视网膜脉络膜病变;余割函数
  • husky[ˈhʌski] adj.嗓子哑的;深沉沙哑的;魁梧的;高大威猛的;强壮的;n.哈士奇;强壮结实的人;爱斯基摩狗(高大强壮,毛厚,用来拉雪橇)
  • pencil-case[ˈpensl keɪs] n.铅笔盒
  • psp 程序段前缀;Play Station Portable,索尼公司开发的新型多功能掌机;
  • 5-htp 5-羟色胺;5羟色氨酸
  • through[θru:] prep. 穿过;贯穿;从…一端至另一端;透过…看到;隔着…听到;自始至终;从头到尾adv. 从头到尾;彻底;自始至终;通过(障碍、阶段或测试);通过;从一端到另一端;

纳米英语英语词典(dict.nm3.cn)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈